Chi tiết tin - Quang Tri Portal
Bao Ninh amusement park for international tourists, Dong Hoi city
BAO NINH AMUSEMENT PARK FOR INTERNATIONAL TOURISTS, DONG HOI CITY

1. Location for the project
- It belongs to the administrative zone of Bao Ninh commune (Dong Hoi city) and Hai Ninh commune (Quang Ninh district)
- It is located at the centre of province, 500 km away from Ha Noi Capital to the South and 1.200 km from Ho Chi Minh City to the North.
- Location of the project is:
+ Borders the East Sea on the East;
+ Borders Vo Ninh - Bao Ninh road on the West;
+ Belongs to the administrative zone of Hai Ninh commune (Quang Ninh district) on the South.
+ Borders Bao Ninh resorts and coastal recreation areas on the North.
2. Purposes of the project
- Construct an international-level recreational area offering services for high-income tourists at the political and cultural center of the province.
- Create a new economic sector to diversify the types of tourism, contributing to changing face of the province and raising capacity to attract domestic and foreign tourists.
- Create an international trade waterway on yacht travel - a "bridge" to attract international financial exchange, a driving force to develop the province's tourism sector.
- Make breakthroughs in economic structure shifting towards accelerating economic growth rate to achieve the province's socio-economic development targets through 2020 and after 2020.
3. Scale and contents of the project
Total land area: about 200 - 250 hectares, including:
- Yacht port: Including 5 main items:
+ Item 1: A system of private resorts along the beach and island: a private multi-functional resort; a private jetty of resort; a high-grade mini yacht.
+ Item 2: A yacht assembly and maintenance factory, including: a jetty with automatic lifting, a yacht assembly factory; a sport product assembly factory (above and under water surface).
+ Item 3: Training school of human resources for marine and yacht.
+ Item 4: Port and international yacht club.
+ Item 5: A logistics center (Petrol station, small supermarket, restaurant, Bar, foodstuff).
- Construct high-ranking accommodations: 4-5 star hotels with 500 - 1,000 rooms.
- Outdoor recreation area:
+ Golf court;
+ Some sport activities on the beach.
4. Total estimated investment capital
1,500 - 2,000 billion dong
5. Expected effectiveness of the project
- Have the potentials to bring high profits
- Complete the development of eco-tourism network of the East of Bao Ninh
6. Major natural characteristics and current status of the project area
Topography: Situated along Bao Ninh and Hai Ninh beaches, about 500 - 800m wide from the seashore and about 5 - 6 km long along the coastline; terrain is relatively flat with low sandy hills.
Technical infrastructure:
- Vo Nguyen Giap street (60m wide) along the project area, 22KV electric network crossing the project area and water supply and drainage: guaranteed.
- Belong to Bao Ninh urban development master plan. The infrastructure system has been invested properly, especially transportation and electricity.
Current status:
- An unoccupied land with some areas covered with casuarinas, acacia auriculiformis and other kind of forest trees.
- Some areas are for raising sea products and other purposes.
- Exploitation project of Phong Nha cave, Don Doong cave and Phong Nha- Ke Bang cave system for tourism (07/04/2015)
- Hai Ninh golf course project, Hai Ninh commune, Quang Ninh district, Quang Binh province (07/04/2015)
- Bao Ninh - Hai Ninh luxury resort (07/04/2015)
- Quang Trach II thermo-electric plant project, Quang Binh province (07/04/2015)
- Quang Binh I wind power plant project (07/04/2015)
- Wastewater treatment plant project in Northwest Dong Hoi industrial park (07/04/2015)
- MDF wood manufacturing plant (07/04/2015)
- Beverage manufacture plant (07/04/2015)
- Factory of fibre processing, dyeing, textile and garment for export (07/04/2015)
- Project of building the export garment factories (07/04/2015)

