Exploitation project of Phong Nha cave, Don Doong cave and Phong Nha- Ke Bang cave system for tourism
EXPLOITATION PROJECT OF PHONG NHA CAVE, SON DOONG CAVE AND PHONG NHA- KE BANG CAVE SYSTEM FOR TOURISM

1. Location for the project
The project area is planned in the core zone of the Phong Nha-Ke Bang National Park in Son Trach Commune, Bo Trach District, Quang Binh Province.
Geographic location:
+ Located in the west of Quang Binh province
+ About 500km from Hanoi Capital to the south
+ About 40km from Dong Hoi City to the northwest.
+ Borders Hin NamNo National Conservation Area (Laos) to the west and southwest.
2. Purposes of the project
- To establish a tourism area to be deserving of the position as a World Natural Heritage Site.
- To introduce and spread the image of Phong Nha - Ke Bang National Park (PNKB NP), especially Son Doong Cave (the world's largest cave which is located in the strictly-protected zone of Phong Nha-Ke Bang NP) to domestic and international tourists, aiming to exploit its tourism potentials.
- To create jobs to local people.
- To attract foreign investment in tourism - the potential of the province, accelerating socio- economic growth rate.
3. Scale and contents of the project
The total area of the project will be identified based on specific surveys, including some items:
- Construction of central station.
- Construction of transportation system:
+ Waterways (to and from Phong Nha Cave)
+ Pipeline (to and from Tien Son Cave)
+ Air travel (to and from Son Doong Cave)
+ Technical equipment system for exploring cave.
- CCTV operational control center.
- Visitor center.
- Health and insurance center.
4. Total estimated investment capital
2,000 billion dong
5. Expected effectiveness of the project
- Have the potential to bring high profits.
- Introduce and spread the image of the world natural heritage site.
- Contribute to effective use of tourism potential of cave system of the Phong Nha-Ke Bang region.
6. Major natural characteristics and current status of the project area
Topography:
The location for the project is mainly characterized with high mountains, rivers and streams, belonging to agricultural land of Son Trach Commune.
Technical infrastructure:
There are currently Road No. 20 and Ho Chi Minh Highway with two branches to the East and the West crossing the area and infrastructure of the Phong Nha-Ke Bang Tourism Center to provide services to tourists to PNKB NP.
- Hai Ninh golf course project, Hai Ninh commune, Quang Ninh district, Quang Binh province (07/04/2015)
- Bao Ninh - Hai Ninh luxury resort (07/04/2015)
- Quang Trach II thermo-electric plant project, Quang Binh province (07/04/2015)
- Quang Binh I wind power plant project (07/04/2015)
- Wastewater treatment plant project in Northwest Dong Hoi industrial park (07/04/2015)
- MDF wood manufacturing plant (07/04/2015)
- Beverage manufacture plant (07/04/2015)
- Factory of fibre processing, dyeing, textile and garment for export (07/04/2015)
- Project of building the export garment factories (07/04/2015)
- Project of constructon of hon la port for 50,000 ton ships in bonded warehouse and oil pipeline system to Laos (07/04/2015)